|
Columbus Regional Hospital
The Columbus
Regional Hospital project was another example of attention to detail
and in this case noise and dust control were critical. When the
area above the loading dock needed to be removed to allow for the
expansion of the surgery suites, ABC was called to cut and remove
the slabs and concrete beams. The necessary cuts were performed
with a flat saw and wall saw.
|